Hydrostatic Pressure Testing of Piping — Inspection and Test Plan

Hydrostatic Pressure Testing of PipingHVAC

ACT-097 / ITP / R00

Hydrostatic Pressure Testing of Piping — Inspection and Test Plan

Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.

Inspection and Test Plan worksheet
Inspection stageCriteria / clauseFrequencyResponsibilityIntervention pointEvidence
Define rated boundary—————
Document venting and protection—————
Witness authorised test and depressurisation—————

Work identification

  • Project / area / grid: ____________________
  • Approved method, drawing and specification revisions: ____________________
  • Equipment and materials in scope: calibrated gauges, pump and isolation equipment

Inspection sequence

  • Define rated boundary
  • Document venting and protection
  • Witness authorised test and depressurisation

Inspection controls

  • Approved pressure and duration, gauge IDs, readings and leakage
  • Enter the approved acceptance clause, inspection frequency, responsible party and hold or witness point for each stage.
  • Project review and approval: ____________________

Preview shown in full. The downloaded DOCX, XLSX and PDF are generated from this record.