ACT-095 / RA / R00
Chilled Water Piping Installation — Risk Assessment
Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.
| Task | Hazard and persons exposed | Initial risk | Controls | Owner | Residual risk |
|---|---|---|---|---|---|
| Coordinate route and expansion | — | — | — | — | — |
| Install and joint | — | — | — | — | — |
| Verify drain and vent positions | — | — | — | — | — |
Work identification
- Project / area / grid: ____________________
- Approved method, drawing and specification revisions: ____________________
- Equipment and materials in scope: chilled-water pipe, guides, anchors and valves
Task risk review
- Coordinate route and expansion
- Install and joint
- Verify drain and vent positions
Assessment prompts
- Assess interfaces relevant to this location: Stored energy, access and equipment handling.
- For each task identify hazards, persons exposed, initial rating, controls, responsible person and residual rating using the project risk matrix.
- Briefing / permit reference / competent reviewer / approval date: ____________________