ACT-095 / ITP / R00
Chilled Water Piping Installation — Inspection and Test Plan
Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.
| Inspection stage | Criteria / clause | Frequency | Responsibility | Intervention point | Evidence |
|---|---|---|---|---|---|
| Coordinate route and expansion | — | — | — | — | — |
| Install and joint | — | — | — | — | — |
| Verify drain and vent positions | — | — | — | — | — |
Work identification
- Project / area / grid: ____________________
- Approved method, drawing and specification revisions: ____________________
- Equipment and materials in scope: chilled-water pipe, guides, anchors and valves
Inspection sequence
- Coordinate route and expansion
- Install and joint
- Verify drain and vent positions
Inspection controls
- Joint traceability, slopes, supports and pressure release
- Enter the approved acceptance clause, inspection frequency, responsible party and hold or witness point for each stage.
- Project review and approval: ____________________