Chilled Water Piping Installation — Inspection Checklist
Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.
| Inspection point | Acceptance reference | Observation | Pass / Fail / N/A | Evidence | Inspector / date |
|---|---|---|---|---|---|
| Coordinate route and expansion | — | — | — | — | — |
| Install and joint | — | — | — | — | — |
| Verify drain and vent positions | — | — | — | — | — |
Work identification
- Project / area / grid: ____________________
- Approved method, drawing and specification revisions: ____________________
- Equipment and materials in scope: chilled-water pipe, guides, anchors and valves
Inspection points
- Coordinate route and expansion
- Install and joint
- Verify drain and vent positions
Records and release
- Joint traceability, slopes, supports and pressure release
- Record observed condition, acceptance reference, result and evidence for each item.
- Inspector / witness / date / corrective action and reinspection: ____________________