Inspection Checklist worksheet
Inspection pointAcceptance referenceObservationPass / Fail / N/AEvidenceInspector / date
Coordinate route and expansion—————
Install and joint—————
Verify drain and vent positions—————

Work identification

  • Project / area / grid: ____________________
  • Approved method, drawing and specification revisions: ____________________
  • Equipment and materials in scope: chilled-water pipe, guides, anchors and valves

Inspection points

  • Coordinate route and expansion
  • Install and joint
  • Verify drain and vent positions

Records and release

  • Joint traceability, slopes, supports and pressure release
  • Record observed condition, acceptance reference, result and evidence for each item.
  • Inspector / witness / date / corrective action and reinspection: ____________________