ACT-092 / RA / R00
Ductwork Fabrication and Installation — Risk Assessment
Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.
| Task | Hazard and persons exposed | Initial risk | Controls | Owner | Residual risk |
|---|---|---|---|---|---|
| Verify class and shop sizes | — | — | — | — | — |
| Fabricate and seal sections | — | — | — | — | — |
| Install supports before closure | — | — | — | — | — |
Work identification
- Project / area / grid: ____________________
- Approved method, drawing and specification revisions: ____________________
- Equipment and materials in scope: duct sections, flanges, sealants and hangers
Task risk review
- Verify class and shop sizes
- Fabricate and seal sections
- Install supports before closure
Assessment prompts
- Assess interfaces relevant to this location: Stored energy, access and equipment handling.
- For each task identify hazards, persons exposed, initial rating, controls, responsible person and residual rating using the project risk matrix.
- Briefing / permit reference / competent reviewer / approval date: ____________________