Ductwork Fabrication and Installation Method Statement

Ductwork Fabrication and InstallationHVAC

ACT-092 / MS / R00

Ductwork Fabrication and Installation Method Statement

Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.

Scope and project location

  • Activity: Ductwork Fabrication and Installation. Discipline: HVAC (Mechanical).
  • Applicable work limits / project / area / grid / exclusions: ____________________

Approved references and technical limits

  • Drawing and revision / specification clause / approved ITP: ____________________
  • Approved engineering design / manufacturer procedure / technical limits / project instructions where applicable: ____________________
  • Permits / isolations / specialist and authority releases as applicable: ____________________

Responsibilities and resources

  • Supervisor / specialist lead / safety lead / QC / consultant witness: ____________________
  • Materials and equipment: duct sections, flanges, sealants and hangers.
  • Approved submittals / equipment IDs and calibration: ____________________

Prerequisites and work sequence

  • Prior-work release / interfaces / access / pre-task briefing: ____________________
  • 1. Verify class and shop sizes.
  • 2. Fabricate and seal sections.
  • 3. Install supports before closure.

Inspection stages and required records

  • Checks and evidence: Duct sizes, joints, clearances and leakage release.
  • Before / during / final inspection: area, acceptance clause, frequency, hold or witness point and record reference: ____________________
  • Nonconformance / corrective action / retest reference: ____________________

Approval

  • Prepared by / reviewed by / approved by / signatures and dates: ____________________