ACT-092 / ITP / R00
Ductwork Fabrication and Installation — Inspection and Test Plan
Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.
| Inspection stage | Criteria / clause | Frequency | Responsibility | Intervention point | Evidence |
|---|---|---|---|---|---|
| Verify class and shop sizes | — | — | — | — | — |
| Fabricate and seal sections | — | — | — | — | — |
| Install supports before closure | — | — | — | — | — |
Work identification
- Project / area / grid: ____________________
- Approved method, drawing and specification revisions: ____________________
- Equipment and materials in scope: duct sections, flanges, sealants and hangers
Inspection sequence
- Verify class and shop sizes
- Fabricate and seal sections
- Install supports before closure
Inspection controls
- Duct sizes, joints, clearances and leakage release
- Enter the approved acceptance clause, inspection frequency, responsible party and hold or witness point for each stage.
- Project review and approval: ____________________