Unitised Curtain Wall Installation — Risk Assessment

Unitised Curtain Wall InstallationArchitectural

ACT-083 / RA / R00

Unitised Curtain Wall Installation — Risk Assessment

Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.

Risk Assessment worksheet
TaskHazard and persons exposedInitial riskControlsOwnerResidual risk
Verify dimensions, brackets and marks—————
Align interlocking units—————
Finish perimeter—————

Work identification

  • Project / area / grid: ____________________
  • Approved method, drawing and specification revisions: ____________________
  • Equipment and materials in scope: marked unitised panels, brackets and lifting accessories

Task risk review

  • Verify dimensions, brackets and marks
  • Align interlocking units
  • Finish perimeter

Assessment prompts

  • Assess interfaces relevant to this location: Falling objects, lifting and access at height.
  • For each task identify hazards, persons exposed, initial rating, controls, responsible person and residual rating using the project risk matrix.
  • Briefing / permit reference / competent reviewer / approval date: ____________________