Unitised Curtain Wall Installation — Inspection and Test Plan

Unitised Curtain Wall InstallationArchitectural

ACT-083 / ITP / R00

Unitised Curtain Wall Installation — Inspection and Test Plan

Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.

Inspection and Test Plan worksheet
Inspection stageCriteria / clauseFrequencyResponsibilityIntervention pointEvidence
Verify dimensions, brackets and marks—————
Align interlocking units—————
Finish perimeter—————

Work identification

  • Project / area / grid: ____________________
  • Approved method, drawing and specification revisions: ____________________
  • Equipment and materials in scope: marked unitised panels, brackets and lifting accessories

Inspection sequence

  • Verify dimensions, brackets and marks
  • Align interlocking units
  • Finish perimeter

Inspection controls

  • Panel IDs, gasket engagement, survey and test evidence
  • Enter the approved acceptance clause, inspection frequency, responsible party and hold or witness point for each stage.
  • Project review and approval: ____________________

Preview shown in full. The downloaded DOCX, XLSX and PDF are generated from this record.