ACT-083 / CHK / R00
Unitised Curtain Wall Installation — Inspection Checklist
Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.
| Inspection point | Acceptance reference | Observation | Pass / Fail / N/A | Evidence | Inspector / date |
|---|---|---|---|---|---|
| Verify dimensions, brackets and marks | — | — | — | — | — |
| Align interlocking units | — | — | — | — | — |
| Finish perimeter | — | — | — | — | — |
Work identification
- Project / area / grid: ____________________
- Approved method, drawing and specification revisions: ____________________
- Equipment and materials in scope: marked unitised panels, brackets and lifting accessories
Inspection points
- Verify dimensions, brackets and marks
- Align interlocking units
- Finish perimeter
Records and release
- Panel IDs, gasket engagement, survey and test evidence
- Record observed condition, acceptance reference, result and evidence for each item.
- Inspector / witness / date / corrective action and reinspection: ____________________