Curtain Wall System Installation — Risk Assessment

Curtain Wall System InstallationArchitectural

ACT-082 / RA / R00

Curtain Wall System Installation — Risk Assessment

Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.

Risk Assessment worksheet
TaskHazard and persons exposedInitial riskControlsOwnerResidual risk
Survey substrate—————
Install and release anchors—————
Assemble and glaze approved bays—————

Work identification

  • Project / area / grid: ____________________
  • Approved method, drawing and specification revisions: ____________________
  • Equipment and materials in scope: mullions, anchors, glazing gaskets and seals

Task risk review

  • Survey substrate
  • Install and release anchors
  • Assemble and glaze approved bays

Assessment prompts

  • Assess interfaces relevant to this location: Falling objects, lifting and access at height.
  • For each task identify hazards, persons exposed, initial rating, controls, responsible person and residual rating using the project risk matrix.
  • Briefing / permit reference / competent reviewer / approval date: ____________________

Preview shown in full. The downloaded DOCX, XLSX and PDF are generated from this record.