ACT-082 / ITP / R00
Curtain Wall System Installation — Inspection and Test Plan
Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.
| Inspection stage | Criteria / clause | Frequency | Responsibility | Intervention point | Evidence |
|---|---|---|---|---|---|
| Survey substrate | — | — | — | — | — |
| Install and release anchors | — | — | — | — | — |
| Assemble and glaze approved bays | — | — | — | — | — |
Work identification
- Project / area / grid: ____________________
- Approved method, drawing and specification revisions: ____________________
- Equipment and materials in scope: mullions, anchors, glazing gaskets and seals
Inspection sequence
- Survey substrate
- Install and release anchors
- Assemble and glaze approved bays
Inspection controls
- Bracket settings, movement, drainage and water test
- Enter the approved acceptance clause, inspection frequency, responsible party and hold or witness point for each stage.
- Project review and approval: ____________________