Inspection and Test PlanACT-082-ITPR00Available

Curtain Wall System Installation — Inspection and Test Plan

Curtain Wall System InstallationArchitectural

ACT-082 / ITP / R00

Curtain Wall System Installation — Inspection and Test Plan

Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.

Inspection and Test Plan worksheet
Inspection stageCriteria / clauseFrequencyResponsibilityIntervention pointEvidence
Survey substrate—————
Install and release anchors—————
Assemble and glaze approved bays—————

Work identification

  • Project / area / grid: ____________________
  • Approved method, drawing and specification revisions: ____________________
  • Equipment and materials in scope: mullions, anchors, glazing gaskets and seals

Inspection sequence

  • Survey substrate
  • Install and release anchors
  • Assemble and glaze approved bays

Inspection controls

  • Bracket settings, movement, drainage and water test
  • Enter the approved acceptance clause, inspection frequency, responsible party and hold or witness point for each stage.
  • Project review and approval: ____________________