ACT-082 / CHK / R00
Curtain Wall System Installation — Inspection Checklist
Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.
| Inspection point | Acceptance reference | Observation | Pass / Fail / N/A | Evidence | Inspector / date |
|---|---|---|---|---|---|
| Survey substrate | — | — | — | — | — |
| Install and release anchors | — | — | — | — | — |
| Assemble and glaze approved bays | — | — | — | — | — |
Work identification
- Project / area / grid: ____________________
- Approved method, drawing and specification revisions: ____________________
- Equipment and materials in scope: mullions, anchors, glazing gaskets and seals
Inspection points
- Survey substrate
- Install and release anchors
- Assemble and glaze approved bays
Records and release
- Bracket settings, movement, drainage and water test
- Record observed condition, acceptance reference, result and evidence for each item.
- Inspector / witness / date / corrective action and reinspection: ____________________