Curtain Wall System Installation — Inspection Checklist

Curtain Wall System InstallationArchitectural

ACT-082 / CHK / R00

Curtain Wall System Installation — Inspection Checklist

Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.

Inspection Checklist worksheet
Inspection pointAcceptance referenceObservationPass / Fail / N/AEvidenceInspector / date
Survey substrate—————
Install and release anchors—————
Assemble and glaze approved bays—————

Work identification

  • Project / area / grid: ____________________
  • Approved method, drawing and specification revisions: ____________________
  • Equipment and materials in scope: mullions, anchors, glazing gaskets and seals

Inspection points

  • Survey substrate
  • Install and release anchors
  • Assemble and glaze approved bays

Records and release

  • Bracket settings, movement, drainage and water test
  • Record observed condition, acceptance reference, result and evidence for each item.
  • Inspector / witness / date / corrective action and reinspection: ____________________

Preview shown in full. The downloaded DOCX, XLSX and PDF are generated from this record.