ACT-080 / RA / R00
Expansion Joints and Fire-Stopping — Risk Assessment
Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.
| Task | Hazard and persons exposed | Initial risk | Controls | Owner | Residual risk |
|---|---|---|---|---|---|
| Identify required movement and rating | — | — | — | — | — |
| Inspect substrate | — | — | — | — | — |
| Install matching documented system | — | — | — | — | — |
Work identification
- Project / area / grid: ____________________
- Approved method, drawing and specification revisions: ____________________
- Equipment and materials in scope: joint covers, backing and listed fire stops
Task risk review
- Identify required movement and rating
- Inspect substrate
- Install matching documented system
Assessment prompts
- Assess interfaces relevant to this location: Tool use, dust, handling and exposure to finishes.
- For each task identify hazards, persons exposed, initial rating, controls, responsible person and residual rating using the project risk matrix.
- Briefing / permit reference / competent reviewer / approval date: ____________________