ACT-080 / ITP / R00
Expansion Joints and Fire-Stopping — Inspection and Test Plan
Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.
| Inspection stage | Criteria / clause | Frequency | Responsibility | Intervention point | Evidence |
|---|---|---|---|---|---|
| Identify required movement and rating | — | — | — | — | — |
| Inspect substrate | — | — | — | — | — |
| Install matching documented system | — | — | — | — | — |
Work identification
- Project / area / grid: ____________________
- Approved method, drawing and specification revisions: ____________________
- Equipment and materials in scope: joint covers, backing and listed fire stops
Inspection sequence
- Identify required movement and rating
- Inspect substrate
- Install matching documented system
Inspection controls
- Tested assembly, depth, gap, lot and concealment photos
- Enter the approved acceptance clause, inspection frequency, responsible party and hold or witness point for each stage.
- Project review and approval: ____________________