Inspection and Test Plan worksheet
Inspection stageCriteria / clauseFrequencyResponsibilityIntervention pointEvidence
Identify required movement and rating—————
Inspect substrate—————
Install matching documented system—————

Work identification

  • Project / area / grid: ____________________
  • Approved method, drawing and specification revisions: ____________________
  • Equipment and materials in scope: joint covers, backing and listed fire stops

Inspection sequence

  • Identify required movement and rating
  • Inspect substrate
  • Install matching documented system

Inspection controls

  • Tested assembly, depth, gap, lot and concealment photos
  • Enter the approved acceptance clause, inspection frequency, responsible party and hold or witness point for each stage.
  • Project review and approval: ____________________