ACT-080 / CHK / R00
Expansion Joints and Fire-Stopping — Inspection Checklist
Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.
| Inspection point | Acceptance reference | Observation | Pass / Fail / N/A | Evidence | Inspector / date |
|---|---|---|---|---|---|
| Identify required movement and rating | — | — | — | — | — |
| Inspect substrate | — | — | — | — | — |
| Install matching documented system | — | — | — | — | — |
Work identification
- Project / area / grid: ____________________
- Approved method, drawing and specification revisions: ____________________
- Equipment and materials in scope: joint covers, backing and listed fire stops
Inspection points
- Identify required movement and rating
- Inspect substrate
- Install matching documented system
Records and release
- Tested assembly, depth, gap, lot and concealment photos
- Record observed condition, acceptance reference, result and evidence for each item.
- Inspector / witness / date / corrective action and reinspection: ____________________