ACT-061 / ITP / R00
Floor Screeding — Inspection and Test Plan
Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.
| Inspection stage | Criteria / clause | Frequency | Responsibility | Intervention point | Evidence |
|---|---|---|---|---|---|
| Set datum and falls | — | — | — | — | — |
| Release substrate | — | — | — | — | — |
| Place and cure specified build-up | — | — | — | — | — |
Work identification
- Project / area / grid: ____________________
- Approved method, drawing and specification revisions: ____________________
- Equipment and materials in scope: approved screed, rails and mixing equipment
Inspection sequence
- Set datum and falls
- Release substrate
- Place and cure specified build-up
Inspection controls
- Levels, moisture and thickness before finishes
- Enter the approved acceptance clause, inspection frequency, responsible party and hold or witness point for each stage.
- Project review and approval: ____________________