ACT-061 / CHK / R00
Floor Screeding — Inspection Checklist
Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.
| Inspection point | Acceptance reference | Observation | Pass / Fail / N/A | Evidence | Inspector / date |
|---|---|---|---|---|---|
| Set datum and falls | — | — | — | — | — |
| Release substrate | — | — | — | — | — |
| Place and cure specified build-up | — | — | — | — | — |
Work identification
- Project / area / grid: ____________________
- Approved method, drawing and specification revisions: ____________________
- Equipment and materials in scope: approved screed, rails and mixing equipment
Inspection points
- Set datum and falls
- Release substrate
- Place and cure specified build-up
Records and release
- Levels, moisture and thickness before finishes
- Record observed condition, acceptance reference, result and evidence for each item.
- Inspector / witness / date / corrective action and reinspection: ____________________