Skip to content

Risk AssessmentACT-058-RAR00Available

Blockwork (Hollow / Solid / AAC) — Risk Assessment

Blockwork (Hollow / Solid / AAC)Architectural

ACT-058 / RA / R00

Blockwork (Hollow / Solid / AAC) — Risk Assessment

Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.

Risk Assessment worksheet
TaskHazard and persons exposedInitial riskControlsOwnerResidual risk
Set out courses—————
Coordinate openings and restraints—————
Protect masonry before finishing—————

Work identification

  • Project / area / grid: ____________________
  • Approved method, drawing and specification revisions: ____________________
  • Equipment and materials in scope: specified blocks, mortar, ties and lintels

Task risk review

  • Set out courses
  • Coordinate openings and restraints
  • Protect masonry before finishing

Assessment prompts

  • Assess interfaces relevant to this location: Tool use, dust, handling and exposure to finishes.
  • For each task identify hazards, persons exposed, initial rating, controls, responsible person and residual rating using the project risk matrix.
  • Briefing / permit reference / competent reviewer / approval date: ____________________

Preview shown in full. The downloaded DOCX, XLSX and PDF are generated from this record.

Other documents for this activity

3