ACT-058 / CHK / R00
Blockwork (Hollow / Solid / AAC) — Inspection Checklist
Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.
| Inspection point | Acceptance reference | Observation | Pass / Fail / N/A | Evidence | Inspector / date |
|---|---|---|---|---|---|
| Set out courses | — | — | — | — | — |
| Coordinate openings and restraints | — | — | — | — | — |
| Protect masonry before finishing | — | — | — | — | — |
Work identification
- Project / area / grid: ____________________
- Approved method, drawing and specification revisions: ____________________
- Equipment and materials in scope: specified blocks, mortar, ties and lintels
Inspection points
- Set out courses
- Coordinate openings and restraints
- Protect masonry before finishing
Records and release
- Block type, joints, plumb and lintel release
- Record observed condition, acceptance reference, result and evidence for each item.
- Inspector / witness / date / corrective action and reinspection: ____________________