Skip to content

Risk AssessmentACT-054-RAR00Available

Metal Deck Installation — Risk Assessment

Metal Deck InstallationStructural

ACT-054 / RA / R00

Metal Deck Installation — Risk Assessment

Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.

Risk Assessment worksheet
TaskHazard and persons exposedInitial riskControlsOwnerResidual risk
Release steel bearings—————
Lay deck in correct direction—————
Secure edges and openings before concrete—————

Work identification

  • Project / area / grid: ____________________
  • Approved method, drawing and specification revisions: ____________________
  • Equipment and materials in scope: metal deck, fixings and edge closures

Task risk review

  • Release steel bearings
  • Lay deck in correct direction
  • Secure edges and openings before concrete

Assessment prompts

  • Assess interfaces relevant to this location: Work at height, lifting and simultaneous trades.
  • For each task identify hazards, persons exposed, initial rating, controls, responsible person and residual rating using the project risk matrix.
  • Briefing / permit reference / competent reviewer / approval date: ____________________

Preview shown in full. The downloaded DOCX, XLSX and PDF are generated from this record.

Other documents for this activity

3