ACT-054 / CHK / R00
Metal Deck Installation — Inspection Checklist
Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.
| Inspection point | Acceptance reference | Observation | Pass / Fail / N/A | Evidence | Inspector / date |
|---|---|---|---|---|---|
| Release steel bearings | — | — | — | — | — |
| Lay deck in correct direction | — | — | — | — | — |
| Secure edges and openings before concrete | — | — | — | — | — |
Work identification
- Project / area / grid: ____________________
- Approved method, drawing and specification revisions: ____________________
- Equipment and materials in scope: metal deck, fixings and edge closures
Inspection points
- Release steel bearings
- Lay deck in correct direction
- Secure edges and openings before concrete
Records and release
- Laps, supports, fixing pattern and pre-pour release
- Record observed condition, acceptance reference, result and evidence for each item.
- Inspector / witness / date / corrective action and reinspection: ____________________