ACT-054 / ITP / R00
Metal Deck Installation — Inspection and Test Plan
Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.
| Inspection stage | Criteria / clause | Frequency | Responsibility | Intervention point | Evidence |
|---|---|---|---|---|---|
| Release steel bearings | — | — | — | — | — |
| Lay deck in correct direction | — | — | — | — | — |
| Secure edges and openings before concrete | — | — | — | — | — |
Work identification
- Project / area / grid: ____________________
- Approved method, drawing and specification revisions: ____________________
- Equipment and materials in scope: metal deck, fixings and edge closures
Inspection sequence
- Release steel bearings
- Lay deck in correct direction
- Secure edges and openings before concrete
Inspection controls
- Laps, supports, fixing pattern and pre-pour release
- Enter the approved acceptance clause, inspection frequency, responsible party and hold or witness point for each stage.
- Project review and approval: ____________________