High-Strength Bolting Works — Risk Assessment

High-Strength Bolting WorksStructural

ACT-052 / RA / R00

High-Strength Bolting Works — Risk Assessment

Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.

Risk Assessment worksheet
TaskHazard and persons exposedInitial riskControlsOwnerResidual risk
Confirm grades and faying surfaces—————
Tighten by approved method—————
Inspect designated connections—————

Work identification

  • Project / area / grid: ____________________
  • Approved method, drawing and specification revisions: ____________________
  • Equipment and materials in scope: specified bolt assemblies and calibrated tools

Task risk review

  • Confirm grades and faying surfaces
  • Tighten by approved method
  • Inspect designated connections

Assessment prompts

  • Assess interfaces relevant to this location: Work at height, lifting and simultaneous trades.
  • For each task identify hazards, persons exposed, initial rating, controls, responsible person and residual rating using the project risk matrix.
  • Briefing / permit reference / competent reviewer / approval date: ____________________