ACT-052 / ITP / R00
High-Strength Bolting Works — Inspection and Test Plan
Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.
| Inspection stage | Criteria / clause | Frequency | Responsibility | Intervention point | Evidence |
|---|---|---|---|---|---|
| Confirm grades and faying surfaces | — | — | — | — | — |
| Tighten by approved method | — | — | — | — | — |
| Inspect designated connections | — | — | — | — | — |
Work identification
- Project / area / grid: ____________________
- Approved method, drawing and specification revisions: ____________________
- Equipment and materials in scope: specified bolt assemblies and calibrated tools
Inspection sequence
- Confirm grades and faying surfaces
- Tighten by approved method
- Inspect designated connections
Inspection controls
- Bolt lot, tool calibration and pretension verification
- Enter the approved acceptance clause, inspection frequency, responsible party and hold or witness point for each stage.
- Project review and approval: ____________________