Formwork Striking and Removal — Risk Assessment

Formwork Striking and RemovalStructural

ACT-050 / RA / R00

Formwork Striking and Removal — Risk Assessment

Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.

Risk Assessment worksheet
TaskHazard and persons exposedInitial riskControlsOwnerResidual risk
Obtain strength and engineering release—————
Mark retained backprops—————
Strip in authorised sequence—————

Work identification

  • Project / area / grid: ____________________
  • Approved method, drawing and specification revisions: ____________________
  • Equipment and materials in scope: approved removal plan, props and handling tools

Task risk review

  • Obtain strength and engineering release
  • Mark retained backprops
  • Strip in authorised sequence

Assessment prompts

  • Assess interfaces relevant to this location: Temporary stability, elevated work and material handling.
  • For each task identify hazards, persons exposed, initial rating, controls, responsible person and residual rating using the project risk matrix.
  • Briefing / permit reference / competent reviewer / approval date: ____________________

Preview shown in full. The downloaded DOCX, XLSX and PDF are generated from this record.