ACT-050 / ITP / R00
Formwork Striking and Removal — Inspection and Test Plan
Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.
| Inspection stage | Criteria / clause | Frequency | Responsibility | Intervention point | Evidence |
|---|---|---|---|---|---|
| Obtain strength and engineering release | — | — | — | — | — |
| Mark retained backprops | — | — | — | — | — |
| Strip in authorised sequence | — | — | — | — | — |
Work identification
- Project / area / grid: ____________________
- Approved method, drawing and specification revisions: ____________________
- Equipment and materials in scope: approved removal plan, props and handling tools
Inspection sequence
- Obtain strength and engineering release
- Mark retained backprops
- Strip in authorised sequence
Inspection controls
- Strength evidence, time, retained support and condition
- Enter the approved acceptance clause, inspection frequency, responsible party and hold or witness point for each stage.
- Project review and approval: ____________________