Formwork Striking and Removal — Inspection and Test Plan

Formwork Striking and RemovalStructural

ACT-050 / ITP / R00

Formwork Striking and Removal — Inspection and Test Plan

Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.

Inspection and Test Plan worksheet
Inspection stageCriteria / clauseFrequencyResponsibilityIntervention pointEvidence
Obtain strength and engineering release—————
Mark retained backprops—————
Strip in authorised sequence—————

Work identification

  • Project / area / grid: ____________________
  • Approved method, drawing and specification revisions: ____________________
  • Equipment and materials in scope: approved removal plan, props and handling tools

Inspection sequence

  • Obtain strength and engineering release
  • Mark retained backprops
  • Strip in authorised sequence

Inspection controls

  • Strength evidence, time, retained support and condition
  • Enter the approved acceptance clause, inspection frequency, responsible party and hold or witness point for each stage.
  • Project review and approval: ____________________