Formwork Striking and Removal — Inspection Checklist

Formwork Striking and RemovalStructural

ACT-050 / CHK / R00

Formwork Striking and Removal — Inspection Checklist

Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.

Inspection Checklist worksheet
Inspection pointAcceptance referenceObservationPass / Fail / N/AEvidenceInspector / date
Obtain strength and engineering release—————
Mark retained backprops—————
Strip in authorised sequence—————

Work identification

  • Project / area / grid: ____________________
  • Approved method, drawing and specification revisions: ____________________
  • Equipment and materials in scope: approved removal plan, props and handling tools

Inspection points

  • Obtain strength and engineering release
  • Mark retained backprops
  • Strip in authorised sequence

Records and release

  • Strength evidence, time, retained support and condition
  • Record observed condition, acceptance reference, result and evidence for each item.
  • Inspector / witness / date / corrective action and reinspection: ____________________

Preview shown in full. The downloaded DOCX, XLSX and PDF are generated from this record.