Water Tanks (Concrete) Construction — Risk Assessment

Water Tanks (Concrete) ConstructionStructural

ACT-049 / RA / R00

Water Tanks (Concrete) Construction — Risk Assessment

Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.

Risk Assessment worksheet
TaskHazard and persons exposedInitial riskControlsOwnerResidual risk
Release tank joints—————
Coordinate penetrations and pours—————
Prepare approved retention test—————

Work identification

  • Project / area / grid: ____________________
  • Approved method, drawing and specification revisions: ____________________
  • Equipment and materials in scope: waterstops, sleeves, reinforcement and concrete

Task risk review

  • Release tank joints
  • Coordinate penetrations and pours
  • Prepare approved retention test

Assessment prompts

  • Assess interfaces relevant to this location: Temporary stability, elevated work and material handling.
  • For each task identify hazards, persons exposed, initial rating, controls, responsible person and residual rating using the project risk matrix.
  • Briefing / permit reference / competent reviewer / approval date: ____________________

Preview shown in full. The downloaded DOCX, XLSX and PDF are generated from this record.