Water Tanks (Concrete) Construction — Inspection and Test Plan

Water Tanks (Concrete) ConstructionStructural

ACT-049 / ITP / R00

Water Tanks (Concrete) Construction — Inspection and Test Plan

Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.

Inspection and Test Plan worksheet
Inspection stageCriteria / clauseFrequencyResponsibilityIntervention pointEvidence
Release tank joints—————
Coordinate penetrations and pours—————
Prepare approved retention test—————

Work identification

  • Project / area / grid: ____________________
  • Approved method, drawing and specification revisions: ____________________
  • Equipment and materials in scope: waterstops, sleeves, reinforcement and concrete

Inspection sequence

  • Release tank joints
  • Coordinate penetrations and pours
  • Prepare approved retention test

Inspection controls

  • Joint continuity, level observations and leak disposition
  • Enter the approved acceptance clause, inspection frequency, responsible party and hold or witness point for each stage.
  • Project review and approval: ____________________

Preview shown in full. The downloaded DOCX, XLSX and PDF are generated from this record.