Skip to content

ChecklistACT-049-CHKR00Available

Water Tanks (Concrete) Construction — Inspection Checklist

Water Tanks (Concrete) ConstructionStructural

ACT-049 / CHK / R00

Water Tanks (Concrete) Construction — Inspection Checklist

Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.

Inspection Checklist worksheet
Inspection pointAcceptance referenceObservationPass / Fail / N/AEvidenceInspector / date
Release tank joints—————
Coordinate penetrations and pours—————
Prepare approved retention test—————

Work identification

  • Project / area / grid: ____________________
  • Approved method, drawing and specification revisions: ____________________
  • Equipment and materials in scope: waterstops, sleeves, reinforcement and concrete

Inspection points

  • Release tank joints
  • Coordinate penetrations and pours
  • Prepare approved retention test

Records and release

  • Joint continuity, level observations and leak disposition
  • Record observed condition, acceptance reference, result and evidence for each item.
  • Inspector / witness / date / corrective action and reinspection: ____________________

Preview shown in full. The downloaded DOCX, XLSX and PDF are generated from this record.

Other documents for this activity

3