ACT-046 / RA / R00
Embedded Items and Sleeves Installation — Risk Assessment
Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.
| Task | Hazard and persons exposed | Initial risk | Controls | Owner | Residual risk |
|---|---|---|---|---|---|
| Coordinate trade openings | — | — | — | — | — |
| Secure embeds | — | — | — | — | — |
| Recheck before concrete | — | — | — | — | — |
Work identification
- Project / area / grid: ____________________
- Approved method, drawing and specification revisions: ____________________
- Equipment and materials in scope: sleeves, inserts, fixings and coordinate drawings
Task risk review
- Coordinate trade openings
- Secure embeds
- Recheck before concrete
Assessment prompts
- Assess interfaces relevant to this location: Temporary stability, elevated work and material handling.
- For each task identify hazards, persons exposed, initial rating, controls, responsible person and residual rating using the project risk matrix.
- Briefing / permit reference / competent reviewer / approval date: ____________________