Embedded Items and Sleeves Installation — Risk Assessment

Embedded Items and Sleeves InstallationStructural

ACT-046 / RA / R00

Embedded Items and Sleeves Installation — Risk Assessment

Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.

Risk Assessment worksheet
TaskHazard and persons exposedInitial riskControlsOwnerResidual risk
Coordinate trade openings—————
Secure embeds—————
Recheck before concrete—————

Work identification

  • Project / area / grid: ____________________
  • Approved method, drawing and specification revisions: ____________________
  • Equipment and materials in scope: sleeves, inserts, fixings and coordinate drawings

Task risk review

  • Coordinate trade openings
  • Secure embeds
  • Recheck before concrete

Assessment prompts

  • Assess interfaces relevant to this location: Temporary stability, elevated work and material handling.
  • For each task identify hazards, persons exposed, initial rating, controls, responsible person and residual rating using the project risk matrix.
  • Briefing / permit reference / competent reviewer / approval date: ____________________

Preview shown in full. The downloaded DOCX, XLSX and PDF are generated from this record.