ACT-046 / CHK / R00
Embedded Items and Sleeves Installation — Inspection Checklist
Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.
| Inspection point | Acceptance reference | Observation | Pass / Fail / N/A | Evidence | Inspector / date |
|---|---|---|---|---|---|
| Coordinate trade openings | — | — | — | — | — |
| Secure embeds | — | — | — | — | — |
| Recheck before concrete | — | — | — | — | — |
Work identification
- Project / area / grid: ____________________
- Approved method, drawing and specification revisions: ____________________
- Equipment and materials in scope: sleeves, inserts, fixings and coordinate drawings
Inspection points
- Coordinate trade openings
- Secure embeds
- Recheck before concrete
Records and release
- Coordinates, level, rotation and rebar clearance
- Record observed condition, acceptance reference, result and evidence for each item.
- Inspector / witness / date / corrective action and reinspection: ____________________