ACT-046 / ITP / R00
Embedded Items and Sleeves Installation — Inspection and Test Plan
Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.
| Inspection stage | Criteria / clause | Frequency | Responsibility | Intervention point | Evidence |
|---|---|---|---|---|---|
| Coordinate trade openings | — | — | — | — | — |
| Secure embeds | — | — | — | — | — |
| Recheck before concrete | — | — | — | — | — |
Work identification
- Project / area / grid: ____________________
- Approved method, drawing and specification revisions: ____________________
- Equipment and materials in scope: sleeves, inserts, fixings and coordinate drawings
Inspection sequence
- Coordinate trade openings
- Secure embeds
- Recheck before concrete
Inspection controls
- Coordinates, level, rotation and rebar clearance
- Enter the approved acceptance clause, inspection frequency, responsible party and hold or witness point for each stage.
- Project review and approval: ____________________