Skip to content

Risk AssessmentACT-037-RAR00Available

Concrete Pumping Works — Risk Assessment

Concrete Pumping WorksStructural

ACT-037 / RA / R00

Concrete Pumping Works — Risk Assessment

Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.

Risk Assessment worksheet
TaskHazard and persons exposedInitial riskControlsOwnerResidual risk
Survey route and bearing area—————
Release specialist pump setup—————
Coordinate placing and washout—————

Work identification

  • Project / area / grid: ____________________
  • Approved method, drawing and specification revisions: ____________________
  • Equipment and materials in scope: pump, pipeline, restraints and washout containment

Task risk review

  • Survey route and bearing area
  • Release specialist pump setup
  • Coordinate placing and washout

Assessment prompts

  • Assess interfaces relevant to this location: Temporary stability, elevated work and material handling.
  • For each task identify hazards, persons exposed, initial rating, controls, responsible person and residual rating using the project risk matrix.
  • Briefing / permit reference / competent reviewer / approval date: ____________________

Preview shown in full. The downloaded DOCX, XLSX and PDF are generated from this record.

Other documents for this activity

3