ACT-037 / CHK / R00
Concrete Pumping Works — Inspection Checklist
Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.
| Inspection point | Acceptance reference | Observation | Pass / Fail / N/A | Evidence | Inspector / date |
|---|---|---|---|---|---|
| Survey route and bearing area | — | — | — | — | — |
| Release specialist pump setup | — | — | — | — | — |
| Coordinate placing and washout | — | — | — | — | — |
Work identification
- Project / area / grid: ____________________
- Approved method, drawing and specification revisions: ____________________
- Equipment and materials in scope: pump, pipeline, restraints and washout containment
Inspection points
- Survey route and bearing area
- Release specialist pump setup
- Coordinate placing and washout
Records and release
- Line inspection, restraint, approved setup and washout disposal
- Record observed condition, acceptance reference, result and evidence for each item.
- Inspector / witness / date / corrective action and reinspection: ____________________