ACT-037 / ITP / R00
Concrete Pumping Works — Inspection and Test Plan
Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.
| Inspection stage | Criteria / clause | Frequency | Responsibility | Intervention point | Evidence |
|---|---|---|---|---|---|
| Survey route and bearing area | — | — | — | — | — |
| Release specialist pump setup | — | — | — | — | — |
| Coordinate placing and washout | — | — | — | — | — |
Work identification
- Project / area / grid: ____________________
- Approved method, drawing and specification revisions: ____________________
- Equipment and materials in scope: pump, pipeline, restraints and washout containment
Inspection sequence
- Survey route and bearing area
- Release specialist pump setup
- Coordinate placing and washout
Inspection controls
- Line inspection, restraint, approved setup and washout disposal
- Enter the approved acceptance clause, inspection frequency, responsible party and hold or witness point for each stage.
- Project review and approval: ____________________