Skip to content

Risk AssessmentACT-034-RAR00Available

Mechanical Couplers (Rebar Splicing) — Risk Assessment

Mechanical Couplers (Rebar Splicing)Structural

ACT-034 / RA / R00

Mechanical Couplers (Rebar Splicing) — Risk Assessment

Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.

Risk Assessment worksheet
TaskHazard and persons exposedInitial riskControlsOwnerResidual risk
Verify compatible bars—————
Inspect ends—————
Assemble under approved supplier method—————

Work identification

  • Project / area / grid: ____________________
  • Approved method, drawing and specification revisions: ____________________
  • Equipment and materials in scope: couplers, prepared bar ends and inspection tools

Task risk review

  • Verify compatible bars
  • Inspect ends
  • Assemble under approved supplier method

Assessment prompts

  • Assess interfaces relevant to this location: Temporary stability, elevated work and material handling.
  • For each task identify hazards, persons exposed, initial rating, controls, responsible person and residual rating using the project risk matrix.
  • Briefing / permit reference / competent reviewer / approval date: ____________________

Preview shown in full. The downloaded DOCX, XLSX and PDF are generated from this record.

Other documents for this activity

3