ACT-034 / ITP / R00
Mechanical Couplers (Rebar Splicing) — Inspection and Test Plan
Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.
| Inspection stage | Criteria / clause | Frequency | Responsibility | Intervention point | Evidence |
|---|---|---|---|---|---|
| Verify compatible bars | — | — | — | — | — |
| Inspect ends | — | — | — | — | — |
| Assemble under approved supplier method | — | — | — | — | — |
Work identification
- Project / area / grid: ____________________
- Approved method, drawing and specification revisions: ____________________
- Equipment and materials in scope: couplers, prepared bar ends and inspection tools
Inspection sequence
- Verify compatible bars
- Inspect ends
- Assemble under approved supplier method
Inspection controls
- Lot, engagement or torque, sample tests and concealment release
- Enter the approved acceptance clause, inspection frequency, responsible party and hold or witness point for each stage.