Skip to content

ChecklistACT-034-CHKR00Available

Mechanical Couplers (Rebar Splicing) — Inspection Checklist

Mechanical Couplers (Rebar Splicing)Structural

ACT-034 / CHK / R00

Mechanical Couplers (Rebar Splicing) — Inspection Checklist

Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.

Inspection Checklist worksheet
Inspection pointAcceptance referenceObservationPass / Fail / N/AEvidenceInspector / date
Verify compatible bars—————
Inspect ends—————
Assemble under approved supplier method—————

Work identification

  • Project / area / grid: ____________________
  • Approved method, drawing and specification revisions: ____________________
  • Equipment and materials in scope: couplers, prepared bar ends and inspection tools

Inspection points

  • Verify compatible bars
  • Inspect ends
  • Assemble under approved supplier method

Records and release

  • Lot, engagement or torque, sample tests and concealment release
  • Record observed condition, acceptance reference, result and evidence for each item.
  • Inspector / witness / date / corrective action and reinspection: ____________________

Preview shown in full. The downloaded DOCX, XLSX and PDF are generated from this record.

Other documents for this activity

3