ACT-031 / RA / R00
Core Wall Jump Form / Climbing Form System — Risk Assessment
Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.
| Task | Hazard and persons exposed | Initial risk | Controls | Owner | Residual risk |
|---|---|---|---|---|---|
| Obtain strength and anchor release | — | — | — | — | — |
| Coordinate supplier climb | — | — | — | — | — |
| Re-inspect at receiving level | — | — | — | — | — |
Work identification
- Project / area / grid: ____________________
- Approved method, drawing and specification revisions: ____________________
- Equipment and materials in scope: climbing platforms, anchors and proprietary equipment
Task risk review
- Obtain strength and anchor release
- Coordinate supplier climb
- Re-inspect at receiving level
Assessment prompts
- Assess interfaces relevant to this location: Temporary stability, elevated work and material handling.
- For each task identify hazards, persons exposed, initial rating, controls, responsible person and residual rating using the project risk matrix.
- Briefing / permit reference / competent reviewer / approval date: ____________________