Risk AssessmentACT-031-RAR00Available

Core Wall Jump Form / Climbing Form System — Risk Assessment

Core Wall Jump Form / Climbing Form SystemStructural

ACT-031 / RA / R00

Core Wall Jump Form / Climbing Form System — Risk Assessment

Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.

Risk Assessment worksheet
TaskHazard and persons exposedInitial riskControlsOwnerResidual risk
Obtain strength and anchor release—————
Coordinate supplier climb—————
Re-inspect at receiving level—————

Work identification

  • Project / area / grid: ____________________
  • Approved method, drawing and specification revisions: ____________________
  • Equipment and materials in scope: climbing platforms, anchors and proprietary equipment

Task risk review

  • Obtain strength and anchor release
  • Coordinate supplier climb
  • Re-inspect at receiving level

Assessment prompts

  • Assess interfaces relevant to this location: Temporary stability, elevated work and material handling.
  • For each task identify hazards, persons exposed, initial rating, controls, responsible person and residual rating using the project risk matrix.
  • Briefing / permit reference / competent reviewer / approval date: ____________________