| Inspection point | Acceptance reference | Observation | Pass / Fail / N/A | Evidence | Inspector / date |
|---|---|---|---|---|---|
| Obtain strength and anchor release | — | — | — | — | — |
| Coordinate supplier climb | — | — | — | — | — |
| Re-inspect at receiving level | — | — | — | — | — |
Work identification
- Project / area / grid: ____________________
- Approved method, drawing and specification revisions: ____________________
- Equipment and materials in scope: climbing platforms, anchors and proprietary equipment
Inspection points
- Obtain strength and anchor release
- Coordinate supplier climb
- Re-inspect at receiving level
Records and release
- Anchor IDs, platform release and cycle configuration
- Record observed condition, acceptance reference, result and evidence for each item.
- Inspector / witness / date / corrective action and reinspection: ____________________