ACT-031 / ITP / R00
Core Wall Jump Form / Climbing Form System — Inspection and Test Plan
Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.
| Inspection stage | Criteria / clause | Frequency | Responsibility | Intervention point | Evidence |
|---|---|---|---|---|---|
| Obtain strength and anchor release | — | — | — | — | — |
| Coordinate supplier climb | — | — | — | — | — |
| Re-inspect at receiving level | — | — | — | — | — |
Work identification
- Project / area / grid: ____________________
- Approved method, drawing and specification revisions: ____________________
- Equipment and materials in scope: climbing platforms, anchors and proprietary equipment
Inspection sequence
- Obtain strength and anchor release
- Coordinate supplier climb
- Re-inspect at receiving level
Inspection controls
- Anchor IDs, platform release and cycle configuration
- Enter the approved acceptance clause, inspection frequency, responsible party and hold or witness point for each stage.
- Project review and approval: ____________________