Risk AssessmentACT-029-RAR00Available

Formwork for Columns and Walls — Risk Assessment

Formwork for Columns and WallsStructural

ACT-029 / RA / R00

Formwork for Columns and Walls — Risk Assessment

Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.

Risk Assessment worksheet
TaskHazard and persons exposedInitial riskControlsOwnerResidual risk
Set out faces—————
Assemble approved support—————
Close after concealed work inspection—————

Work identification

  • Project / area / grid: ____________________
  • Approved method, drawing and specification revisions: ____________________
  • Equipment and materials in scope: panels, ties, brackets and release agent

Task risk review

  • Set out faces
  • Assemble approved support
  • Close after concealed work inspection

Assessment prompts

  • Assess interfaces relevant to this location: Temporary stability, elevated work and material handling.
  • For each task identify hazards, persons exposed, initial rating, controls, responsible person and residual rating using the project risk matrix.
  • Briefing / permit reference / competent reviewer / approval date: ____________________

Preview shown in full. The downloaded DOCX, XLSX and PDF are generated from this record.