Formwork for Columns and Walls — Inspection and Test Plan

Formwork for Columns and WallsStructural

ACT-029 / ITP / R00

Formwork for Columns and Walls — Inspection and Test Plan

Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.

Inspection and Test Plan worksheet
Inspection stageCriteria / clauseFrequencyResponsibilityIntervention pointEvidence
Set out faces—————
Assemble approved support—————
Close after concealed work inspection—————

Work identification

  • Project / area / grid: ____________________
  • Approved method, drawing and specification revisions: ____________________
  • Equipment and materials in scope: panels, ties, brackets and release agent

Inspection sequence

  • Set out faces
  • Assemble approved support
  • Close after concealed work inspection

Inspection controls

  • Dimensions, plumb, cleanout and pre-pour approval
  • Enter the approved acceptance clause, inspection frequency, responsible party and hold or witness point for each stage.
  • Project review and approval: ____________________

Preview shown in full. The downloaded DOCX, XLSX and PDF are generated from this record.