ACT-029 / ITP / R00
Formwork for Columns and Walls — Inspection and Test Plan
Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.
| Inspection stage | Criteria / clause | Frequency | Responsibility | Intervention point | Evidence |
|---|---|---|---|---|---|
| Set out faces | — | — | — | — | — |
| Assemble approved support | — | — | — | — | — |
| Close after concealed work inspection | — | — | — | — | — |
Work identification
- Project / area / grid: ____________________
- Approved method, drawing and specification revisions: ____________________
- Equipment and materials in scope: panels, ties, brackets and release agent
Inspection sequence
- Set out faces
- Assemble approved support
- Close after concealed work inspection
Inspection controls
- Dimensions, plumb, cleanout and pre-pour approval
- Enter the approved acceptance clause, inspection frequency, responsible party and hold or witness point for each stage.
- Project review and approval: ____________________