Formwork for Columns and Walls — Inspection Checklist

Formwork for Columns and WallsStructural

ACT-029 / CHK / R00

Formwork for Columns and Walls — Inspection Checklist

Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.

Inspection Checklist worksheet
Inspection pointAcceptance referenceObservationPass / Fail / N/AEvidenceInspector / date
Set out faces—————
Assemble approved support—————
Close after concealed work inspection—————

Work identification

  • Project / area / grid: ____________________
  • Approved method, drawing and specification revisions: ____________________
  • Equipment and materials in scope: panels, ties, brackets and release agent

Inspection points

  • Set out faces
  • Assemble approved support
  • Close after concealed work inspection

Records and release

  • Dimensions, plumb, cleanout and pre-pour approval
  • Record observed condition, acceptance reference, result and evidence for each item.
  • Inspector / witness / date / corrective action and reinspection: ____________________

Preview shown in full. The downloaded DOCX, XLSX and PDF are generated from this record.