Temporary Works (Propping and Back-Propping) — Risk Assessment

Temporary Works (Propping and Back-Propping)Project Management

ACT-010 / RA / R00

Temporary Works (Propping and Back-Propping) — Risk Assessment

Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.

Risk Assessment worksheet
TaskHazard and persons exposedInitial riskControlsOwnerResidual risk
Identify load path—————
Release bearing surfaces—————
Install and inspect against engineered layout before loading—————

Work identification

  • Project / area / grid: ____________________
  • Approved method, drawing and specification revisions: ____________________
  • Equipment and materials in scope: props, heads and spreaders

Task risk review

  • Identify load path
  • Release bearing surfaces
  • Install and inspect against engineered layout before loading

Assessment prompts

  • Assess interfaces relevant to this location: Moving plant, temporary services and public access.
  • For each task identify hazards, persons exposed, initial rating, controls, responsible person and residual rating using the project risk matrix.
  • Briefing / permit reference / competent reviewer / approval date: ____________________

Preview shown in full. The downloaded DOCX, XLSX and PDF are generated from this record.