Temporary Works (Propping and Back-Propping) — Inspection and Test Plan

Temporary Works (Propping and Back-Propping)Project Management

ACT-010 / ITP / R00

Temporary Works (Propping and Back-Propping) — Inspection and Test Plan

Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.

Inspection and Test Plan worksheet
Inspection stageCriteria / clauseFrequencyResponsibilityIntervention pointEvidence
Identify load path—————
Release bearing surfaces—————
Install and inspect against engineered layout before loading—————

Work identification

  • Project / area / grid: ____________________
  • Approved method, drawing and specification revisions: ____________________
  • Equipment and materials in scope: props, heads and spreaders

Inspection sequence

  • Identify load path
  • Release bearing surfaces
  • Install and inspect against engineered layout before loading

Inspection controls

  • Prop grid, retained levels, loads and removal authorisation
  • Enter the approved acceptance clause, inspection frequency, responsible party and hold or witness point for each stage.
  • Project review and approval: ____________________