ACT-010 / ITP / R00
Temporary Works (Propping and Back-Propping) — Inspection and Test Plan
Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.
| Inspection stage | Criteria / clause | Frequency | Responsibility | Intervention point | Evidence |
|---|---|---|---|---|---|
| Identify load path | — | — | — | — | — |
| Release bearing surfaces | — | — | — | — | — |
| Install and inspect against engineered layout before loading | — | — | — | — | — |
Work identification
- Project / area / grid: ____________________
- Approved method, drawing and specification revisions: ____________________
- Equipment and materials in scope: props, heads and spreaders
Inspection sequence
- Identify load path
- Release bearing surfaces
- Install and inspect against engineered layout before loading
Inspection controls
- Prop grid, retained levels, loads and removal authorisation
- Enter the approved acceptance clause, inspection frequency, responsible party and hold or witness point for each stage.
- Project review and approval: ____________________