Temporary Works (Propping and Back-Propping) — Inspection Checklist

Temporary Works (Propping and Back-Propping)Project Management

ACT-010 / CHK / R00

Temporary Works (Propping and Back-Propping) — Inspection Checklist

Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.

Inspection Checklist worksheet
Inspection pointAcceptance referenceObservationPass / Fail / N/AEvidenceInspector / date
Identify load path—————
Release bearing surfaces—————
Install and inspect against engineered layout before loading—————

Work identification

  • Project / area / grid: ____________________
  • Approved method, drawing and specification revisions: ____________________
  • Equipment and materials in scope: props, heads and spreaders

Inspection points

  • Identify load path
  • Release bearing surfaces
  • Install and inspect against engineered layout before loading

Records and release

  • Prop grid, retained levels, loads and removal authorisation
  • Record observed condition, acceptance reference, result and evidence for each item.
  • Inspector / witness / date / corrective action and reinspection: ____________________

Preview shown in full. The downloaded DOCX, XLSX and PDF are generated from this record.