Passenger/Material Hoist Installation and Dismantling — Risk Assessment

Passenger/Material Hoist Installation and DismantlingProject Management

ACT-007 / RA / R00

Passenger/Material Hoist Installation and Dismantling — Risk Assessment

Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.

Risk Assessment worksheet
TaskHazard and persons exposedInitial riskControlsOwnerResidual risk
Release base and ties—————
Coordinate specialist erection—————
Obtain commissioning clearance—————

Work identification

  • Project / area / grid: ____________________
  • Approved method, drawing and specification revisions: ____________________
  • Equipment and materials in scope: mast, cage, landings and interlocked gates

Task risk review

  • Release base and ties
  • Coordinate specialist erection
  • Obtain commissioning clearance

Assessment prompts

  • Assess interfaces relevant to this location: Moving plant, temporary services and public access.
  • For each task identify hazards, persons exposed, initial rating, controls, responsible person and residual rating using the project risk matrix.
  • Briefing / permit reference / competent reviewer / approval date: ____________________

Preview shown in full. The downloaded DOCX, XLSX and PDF are generated from this record.